Laserfiche WebLink
Tabetha Lynch, DRMS <br />Page 2 <br />January 15, 2015 <br />Rule 2.05.3(4) <br />Ponds impoundments, other treatment facilities and diversions; general plan detailed design for each <br />along with map of location and cross section, as well as maintenance, PE, submission to state engineer <br />and MSHA. Applicable to this PR in the interest of how the flooded mine workings water will be <br />handled, if is to be brought to the surface. <br />Mine operations in relation to the movement or removal of water from the overlying flooded Wadge <br />Seam mine workings have not been clearing specified in this PR. <br />"TC is currently developing detailed mine dewatering plans, which will be submitted for CDRMS review <br />and approval prior to initiating any mining in the affected areas." (p. 2.04 -11) <br />Rational for not including this information in this PR is that the initial development and mining of WC- <br />9RT through 5RT would not be affected by the currently pooled water. <br />A general discussion of water handling of additional WCF inflows and transfer of water from overlying <br />flooded areas is provided (p. 2.05 -139). <br />Rule 2.05.6(3)(b)(iii) and (iv) <br />Probable hydrologic consequences, quantity and quality in all seasonal conditions, additions to the <br />monitoring plan or reclamation. <br />Additional monitoring wells have been added to the monitoring network. Table 7 and Map 13 <br />Quantity and quality are discussed in relation to probably hydrologic consequence. <br />