My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-13_INSPECTION - M1985040
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1985040
>
2015-01-13_INSPECTION - M1985040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:34 PM
Creation date
1/15/2015 8:34:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985040
IBM Index Class Name
Inspection
Doc Date
1/13/2015
Doc Name
Insp. Rpt.
From
DRMS
To
Seifert Construction
Inspection Date
12/2/2014
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of <br /> yam' t O <br /> * G� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> „/876• 1313 Sherman Street,Room 215,Denver,Colorado 80203 Phone(303)866-3567 <br /> TECHNICAL REVISION (TR) APPLICATION <br /> FOR INTERMITTENT STATUS <br /> (mining activities occur each year, for less than 180 days each year) <br /> Today's date: <br /> Permit number: M- Site name: <br /> County: TR number: (DBMS use only) <br /> Permittee making request: <br /> Operator(if other than permittee): <br /> Date intermittent status begins: <br /> Reason mining activities (materials extraction,processing, or hauling)will occur less than 180 days per year: <br /> Number of affected acres: <br /> Amount of financial warranty(bond) on deposit with the state: $ <br /> Required fees for technical revision by permit type (please mark the correct fee and submit it with this <br /> request for a technical revision): <br /> Permit type Required TR fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 ❑ <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1,006 ❑ <br /> I request intermittent status for the above-referenced permit. This site has reserves <br /> remaining to be mined. Mining activities will occur each year for less than 180 days per <br /> year. <br /> Operator's signature: <br /> Please note: <br /> 1. While in intermittent status, the operator must continue to comply with the Rules and Act, including <br /> maintaining the site, and must continue to file an annual report and annual fee when due. <br /> 2. If production ceases for 180 days or more, the operator must either file a Notice of Temporary <br /> Cessation, or reclaim the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.