Laserfiche WebLink
-4- <br /> 12. Prima( future(Post-mining)land use(check one): <br /> L.l Cropland(CR) Ej Pastureland(PL) „❑ General Agriculture(GA) <br /> Ci Rangeland(RL) n Forestry(FR) Wildlife Habitat(WL) 1 <br /> Residential(RS) ❑ Recreation(RC) Industrial/Commercial(IC) <br /> -i_1 Developed Water Resources(WR) El Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> ❑ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> n Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> BResidential(RS) J1 Recreation(RC) II Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> surface excavation of topsoil, overburden and gravel using dozers, loaders, trucks <br /> 15. On Site Processing: IN Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): mining by dozers, loaders, trucks <br /> Crushing, screening, stockpiling and loading <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> fuel, oil, and other chemicals associated with the processing plants <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />