Laserfiche WebLink
■110°ILIA011411L. <br /> PIONEER '✓ 4N 1 4 2015 <br /> SAND COMPANY INC. <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Cglorado Division of <br /> eclamation Mining and Safety <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> RE: Pit M-1993-050 <br /> tiR-02 <br /> Attn: Tim Cazier <br /> f <br /> In response to your letter of map deficiencies: <br /> Phase 1 of mining plan has been partially reclaimed and has some active mining in the west portion. <br /> I would suggest keeping the entire Phase 1 in active mining. <br /> Phase 2-6 are done with mining operations. Phase 4 and 6 were never mined due to lack of material to <br /> mine. <br /> I have attached an updated mining table. All other mining phases are still current in mining Plan and <br /> Maps. <br /> Mike Ausburn <br /> VP <br /> P.O. Box 7650 • Colorado Springs, Colorado 80933-7650 • (719) 599-8100 <br />