My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-09_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2015-01-09_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:30 PM
Creation date
1/14/2015 1:44:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
1/9/2015
Doc Name
9/19/2014 MR171 Stability Analysis Coverfill Stockpile
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
✓= b, <br />Huddle,tsut -Bern' <br />1.0 INTRODUCTION <br />As part of their operations, Bowie Resources, LLC currently stockpiles some <br />coverfill on top of gob pile #2 and additional stockpiles are proposed. As part of the <br />design development process, Huddleston -Berry Engineering and Testing, LLC (HBET) <br />was retained by Bowie Resources to evaluate the impacts of stockpiling coverfill on the <br />stability of gob pile #2. <br />1.1 Referenced Documents <br />As pant of our assessment, HBET reviewed the following documents. <br />• klonthly Sumnuuy of Vibrating Wire Piezometers August 2014, Botivie Mine No. <br />2, Coal Waste Disposal Area No. 2 by Buckhorn Geotech, Inc., August 26, 2014 <br />• 11onthly Sunnnaty of Vibrating Wire Piezometers July 2014, Bowie Mine No. 2, <br />Coal Waste Disposal Area No. 2 by Buckhorn Geotech, Inc., August 1, 2014. <br />• Stability Evaluation, Proposed Full Buildout, Gob Pile #2, Bowie No. 2 Mine by <br />Huddleston -Berry Engineering & Testing, LLC for Bowie Resources, LLC, July <br />30, 2014. <br />• Stability Evaluation, Technical Revision #85, Gob Pile #2 Drying Area, Bowie <br />No. 2 Mine by Huddleston -Berry Engineering & Testing, LLC for Bowie <br />Resources, LLC, June 3, 2014. <br />1.2 Scope <br />As discussed above, Bowie Resources, LLC currently stockpiles some coverfill <br />soil on a portion of gob pile #2 and additional coverfill is proposed to be stockpiled on <br />the gob pile. The purpose of our evaluation was to determine the impacts on the existing <br />gob pile #2 associated with stockpiling coverfill on top of the existing pile. The scope of <br />the work included the following components: <br />• Reviewing available data to define engineering parameters, piezometric <br />surface elevation, etc. <br />• Setting up models which represent the existing gob pile #2, existing coverfill <br />stockpile, and proposed coverfill stockpile. <br />• Evaluating the impacts of the coverfill stockpiles to the stability of gob pile #2. <br />The evaluation was completed by a Colorado registered professional engineer in <br />accordance with generally accepted geotechnical engineering practices. This report has <br />been prepared for the exclusive use of Bowie Resources, LLC. <br />2.0 BACKGROUND <br />The available reference documentation indicates that the original geotechnical <br />investigation was completed by Lambert and Associates (Lambert) in 2003 and that <br />placement of coal mine waste at gob pile #2 began in 2004. Additional evaluation of the <br />stability of gob pile #2 was completed by Lambert and Buckhorn Geotech, Inc. <br />(Buckhorn) in 2005. Based upon the results of these analyses, maximum slopes of <br />5H:1 V were specified for gob pile #2. However, this was based upon the assumption that <br />undrained (total stress) conditions would exist within the gob pile. <br />X X2008 ALL PROJECTS 01349 - Bo%%ie Resources. LLC 013.19 -0001 BOA %ic \Iine'\200 - G.o' Gob 2 Co%"Il Stabditj 01349.0001 R091914 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.