Laserfiche WebLink
January 7, 2015 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />�l <br />Recently compacted <br />material in lower TR -76 <br />-� expansion area in middle <br />ground. <br />Regraded eastern portion <br />of Gob Pile 94 is in <br />.y background. <br />i <br />P Gob Pile 93 cover <br />- material stockpile. <br />Cover material <br />- excavation to left. <br />End dumped refuse in <br />eastern drying area. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 8 of 10 <br />