Laserfiche WebLink
Loloff Construction <br /> J&T Consulting, Inc. <br /> Loloff Mine <br /> 12/22/2014 <br /> Reclamation Bond Quantities and Costs Bond Calc with 1 GIC Share and 1 New Cache Share <br /> ®2014 AT Consulting'.liae., <br /> Summary of Unit Costa <br /> Direct costs <br /> Scarifying Ground $ 200 /acre <br /> Re-applying topsoil 12"thick $ 2,000 /acre <br /> Revegetating/Seeding disturbed area $ 1,000 /acre <br /> Mobilization $ 2,500 lump sum <br /> Slurry Wall Cost Breakdown(0-50 ft t $3/ft-51-70 ft $4/ft <br /> Slurry Wall Cost(45 to 50 foot average depth) $ 135 /linear foot <br /> Overhead and Profit Costs <br /> Liability insurance 1.55% of direct cost <br /> Performance bond 1.05% of direct cost <br /> Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br /> Project Management <br /> Engineering and bidding 4.25% of direct cost <br /> Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br /> Phaao 1 (5.8 acres)(Area that has 1 GIC share and 1 New Cache share to cover permanent augmentation) <br /> Jeciamation Operation Quantity Unit Unit Cost Cost <br /> Active M/Mna Area(Part of Exist Ina Exposed Ground Water Area <br /> Scarifying Ground in Disturbed Area - ac $ 200 $ - <br /> Topsoil Placement in Disturbed Area - ac $ 2,000 $ <br /> Revegetate Disturbed Area - ac $ 1,000 $ <br /> Mobilization - Is $ 2,500 $ - <br /> Total Direct Cost $ - <br /> Overhead and Profit Cost(12 60%) $ - <br /> Contract Cost $ - <br /> Project Management(9.25%) $ - <br /> I Total Required Financial Warranty For Phase 1 $ <br /> 1 of 2 <br />