My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-12_REVISION - M1985112 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2015-01-12_REVISION - M1985112 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:19 PM
Creation date
1/13/2015 9:39:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
Revision
Doc Date
1/12/2015
Doc Name
New Amendment
From
Loloff Construction, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr. Jared Dains, E.l. Page 4 of 6 <br /> Loloff SWSP <br /> February 3, 2014 <br /> use of the Graham Ditch water for augmentation purposes is approved by the water <br /> court. <br /> Conditions of Approval <br /> I approve the proposed substitute water supply plan in accordance with Section 37-90- <br /> 137(11), C.R.S., subject to the following conditions: <br /> 1. This SWSP shall be valid for the period of January 1, 2014 through December 31, 2014, <br /> unless otherwise revoked, modified, or superseded by decree. If this plan will not be <br /> made absolute by a water court action by the plan's expiration date, a renewal request <br /> must be submitted to this office with the statutory fee (currently$257) no later than <br /> November 15, 2014. <br /> 2. A well permit was obtained for the current use and exposed pond surface area of the <br /> gravel pit in accordance with §37-90-137(2) and(11), C.R.S., permit no. 77467-F. <br /> 3. The total surface area of the groundwater exposed at the site must not exceed 2.0 <br /> acres, resulting in 5.84 acre-feet of evaporative loss. <br /> 4. The annual amount of water used at the Loloff Pit for dust control shall not exceed 3.60 <br /> acre-feet and total product mined at the site shall not exceed 200,000 tons resulting in <br /> 2.94 acre-feet of water lost with the mined aggregate. <br /> 5. Total consumption at the Loloff Pit must not exceed these aforementioned amounts <br /> unless an amendment is made to this plan. <br /> 6. Approval of this plan is for the purposes as stated herein. Any additional uses for which <br /> the water may be used will be allowed only if a new SWSP is approved for those <br /> additional uses. <br /> 7. All releases of replacement water must be sufficient to cover all out-of-priority depletions <br /> • <br /> in time, place, and amount and must be made under the direction and/or the approval of <br /> the water commissioner. The release of replacement water may be aggregated to <br /> maximize beneficial use. The water commissioner and/or the division engineer shall <br /> determine the rate and timing of an aggregated release. The Applicant is required to <br /> coordinate with the water commissioner the delivery location of replacement water to <br /> ensure out-of-priority depletions are adequately replaced to prevent injury to other water <br /> rights. Conveyance loss for delivery of augmentation water is subject to assessment and <br /> modification as determined by the water commissioner or division engineer. <br /> 8. The replacement water that is the subject of this plan cannot be sold or leased to any other <br /> entity. As a condition of subsequent renewals of this substitute water supply plan,the <br /> replacement water must be appurtenant to this site until a plan for augmentation is <br /> obtained.A copy of this approval letter should be recorded with the county clerk and <br /> recorder.All replacement water must be concurrent with depletions in quantity,timing, and <br /> location. <br /> 9. The name, address, and phone number of the contact person who will be responsible for <br /> the operation and accounting of this plan must be provided on the accounting forms <br /> submitted to the division engineer and the water commissioner. <br /> 10.Adequate accounting of depletions and replacements must be provided to the division <br /> engineer in Greeley (Div1Accountinanstate.co.us) and the water commissioner <br /> (Mark.Simpson cc state.co.us) on a monthly basis. Submitted accounting shall conform to <br />
The URL can be used to link to this page
Your browser does not support the video tag.