Laserfiche WebLink
(f) The backsloping and final pit floor will be graded concurrent with the mining. It is <br /> planned to start reclaiming 5 to 10 acres areas as they are deemed mined-out. This <br /> allows the operator the allotted time to establish a planned reclamation plan and <br /> continue to mine. <br /> As stated before, this is on an upland terrace deposit with the following characteristics: <br /> (SOILS INFO) <br />