Laserfiche WebLink
-3- <br /> 6) a) Pursuant to 34-32-118(5) of the Act, the Board has a right of entry to reclaim the <br /> lands affected by the operation or to respond to an emergency where the Division determines that any of the <br /> conditions of C.R.S.34-32-124.5.exist <br /> b) The Board will enter the lands to perform reclamation only if the Board has <br /> determined that: <br /> i. reclamation required by the permit, statute, or regulations to be performed <br /> upon such lands has not been performed,or <br /> ii. financial warranty forfeiture proceedings described in the Act or similar <br /> provisions of subsequent laws, if any,have been initiated. <br /> c) The Division, acting for the Board, will enter lands to respond to an emergency <br /> only where the Division determines that any of the conditions of Construction Material Rule 8.4.2.exist. <br /> 7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br /> reference. <br /> / / a) Rider is attached. <br /> / X / b) No rider is attached. <br /> MINED LAND RECLAMATION BOARD <br /> COLORADO DEPARTMENT OF NATURAL RESOURCES <br /> VIRGINIA BRANNON <br /> Division Director <br />