Laserfiche WebLink
am&P <br /> Tertiary Underdrain: No work was performed during this reporting period. <br /> Leak Detection: No work was performed during this reporting period. <br /> B) Underground Workings: <br /> No work was performed during this reporting period. <br /> C) Geomembrane: <br /> Phase 1 80-mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br /> D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br /> E) High Volume Solution Collection System Piping (HVSCS): <br /> No work was performed during this reporting period. <br /> II) Storm Water Management <br /> No observations to report during this period. <br /> CQA ACTIVITIES: <br /> I) Field Activities: None. <br /> II) Laboratory Activities: None. <br /> General Project Items <br /> Meetings and Discussions: None <br /> Summary of Concerns: None. <br /> CC&V: None. <br /> Miscellaneous: No work was performed during this reporting period for the holiday break. <br /> Deliveries: None. <br /> Submitted by: Eric Lorenson Date: January 6, 2015 <br /> Reviewed _ _ Date: January 6, 2015 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CCSV Projects <br /> Reviewed By: `;41.°' Date: / /2 it S <br /> Reviewed By: �7, 9.7/7 Date: / 7_ <br /> 2015-01-03-mle2 weekly final Page 2 of 3 <br />