My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-09_REPORT - M1981075
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981075
>
2015-01-09_REPORT - M1981075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:12:01 AM
Creation date
1/13/2015 8:47:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981075
IBM Index Class Name
REPORT
Doc Date
1/9/2015
From
Phillips Stone Company, Inc.
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Fee/Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE( 'PV D Page2of3 <br /> JAN 0 9 2015 <br /> DIVISK .. ,o,ATION, 110c Annual Report <br /> r�` �����J Lam� <br /> Pe ee Name: Phillips Stone Company, Permit Number: M-1981-075 <br /> Inc. <br /> Operation Name: Phillips Stone Company County: Boulder <br /> Annual Fee Due: $323.00 Anniversary Date: July 30,2014 <br /> Permit Acreage: 9.90 Current Bond Amt: $6,010.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). (SiE NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). 'E NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> j/a4tit, <br /> 5. Does the mine operate more than 180 days per year? NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES Se <br /> b)approval for INTERMITTENT OPERATION? YES Se <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). � atiLP,CV <br /> 8. Number of acres that were newly affected during the current report year. 0 <br /> 9. Number of acres that were reclaimed during the current report year. e. (rift <br /> 10. Estimated new acreage to be affected in the next report year. at k .i <br /> 11. Estimated acres to be reclaimed in the next report year. Da k/111)(4-1 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: G'rJ, seeded w/ w/topsoil mulched w/ <br /> -� approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application tt\-�'a application application <br /> method: method: method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.