My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-12_HYDROLOGY - C1980004 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980004
>
2015-01-12_HYDROLOGY - C1980004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:32 PM
Creation date
1/12/2015 10:12:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Hydrology
Doc Date
1/12/2015
Doc Name
4th Quarter 2014 Surface Water
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Other Surface Water
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McClave Canyon Mining LLC <br />Water Sampling Report <br />Date: December 18, 2014 <br />Weather Conditions: Clear, Cool, —30 degrees F. <br />Surface Water <br />Sample Time Flow EC Temp <br />Point cfs p H umhos /cm p ( ) <br />SW -1 <br />1:45 PM <br />Dry <br />- <br />- <br />- <br />SW -2 <br />1:40 PM <br />Dry <br />- <br />- <br />- <br />SW -3 <br />2:45 PM <br />Dry <br />- <br />- <br />- <br />SW -5 <br />1:35 PM <br />Dry <br />- <br />- <br />- <br />SW -8 <br />2:35 PM <br />Dry <br />- <br />- <br />- <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek —2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />Forth Quarter 2014 <br />Sampled by: Jim Riddle <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -1 Total Depth <br />GW -3 Total Depth <br />GW -6 Total Depth <br />GW -9 Total Depth <br />Feet <br />14.3 <br />47.3 <br />18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />53.5 <br />♦��� EG1�� <br />•�Pac3Es,,� t <br />Ik 9 � • <br />woo <br />Ground Water <br />Sample <br />Time <br />feet <br />pH <br />umhos /cm <br />Temp (C) <br />GW -1 <br />2:10 PM <br />10.0 <br />7.9 <br />6180 <br />13.9 <br />GW -3 <br />2:40 PM <br />37.0 <br />7.6 <br />3860 <br />15.8 <br />GW -6 <br />2:50 PM <br />Dry-1 8.8' <br />GW -9 <br />1:40 PM <br />22.5 <br />7.5 <br />6600 <br />15.5 <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek —2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -X McClane Creek at confluence with East Salt Creek <br />Forth Quarter 2014 <br />Sampled by: Jim Riddle <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW -3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW -6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW -9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -1 Total Depth <br />GW -3 Total Depth <br />GW -6 Total Depth <br />GW -9 Total Depth <br />Feet <br />14.3 <br />47.3 <br />18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />53.5 <br />♦��� EG1�� <br />•�Pac3Es,,� t <br />Ik 9 � • <br />woo <br />
The URL can be used to link to this page
Your browser does not support the video tag.