Laserfiche WebLink
-4- <br />12. Primary future (Post- minine) land use (check one): <br />-ICI Cropland(CR) j_J Pastureland(PL) <br />II Rangeland(RL) Forestry(FR) <br />Residential(RS) -E] Recreation(RC) <br />- Developed Water Resources(WR) <br />13. Primary Present land use (check one : <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) '� Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dry mining <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />15. On Site Processine: 7 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator/Truck <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Installation of a French drain along the south and west Dortions of the north cell of Pit 29 (Parcel A) to <br />alleviate ground water mounding at the pinch point between Pit 29 and the Stagecoach Pit. The French <br />drain along the west side will be located inside the rep sent permit boundary as will all construction <br />activities for the initial installation of that drain. The French drain along the south side will be located <br />outizor's the prer-eAt permit boundary aa wall the Gonstructionactivities for the initial installation of that d <br />An easement for the south drain and the construction activities has been obtained and one purpose of this <br />amendment Is to obtaii i approval for am extension of the permit area (by approximately 2.2 seres) to <br />accommodate these activities. <br />