Laserfiche WebLink
December 31, 2014 C- 1996- 083/Bowie No. 2 Mine SLB <br />PHOTOGRAPHS <br />Main haul road to fan bench, B Portal bench, and D Portal bench. <br />kiv\ <br />M <br />Coal stockpile bench, Pond B, Topsoil Stockpile A, west Gob Pile 43, Pond C <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 5 <br />