Laserfiche WebLink
13. Is the reserved topsoil vegetatedfstabiliued in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? <br />15. Are all hazardous mzterials stored within approved spill containment structures? <br />p.4 <br />Page 3 of 4 <br />YES INTO <br />plan and Office of the <br />YES NO <br />YES NO <br />16. Does your NOI reclamation plan or Envirownental Protection Plan require you to submit i aonitoring infqgpation <br />annually? YES N •'A <br />If "Yes", please attach the required monitoring results to this Annual Report as required bt r Rule 1.15(1)(c). <br />17. As required by Rule 5.6(I)(g) subnut with this report documentation to show that the Fingal Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FIN 4CIAL WARRANT rY DOCUMENTATION ATTACHED: <br />Q ©�2C <br />18. Please use the spar low to describe as required by Rule 5.6(1)(c) any new prospecting.dctivity that occurred during <br />the preceding year, including the locations and number -of next surface drill holes, mud pi4, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the Ineasures taken to safeguard <br />shafts, adits and other mine openings from unauth-oriaed entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />� r <br />I <br />