Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12. Primary Most-mining) heck one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />-0 Residential(RS) Recreation(RC) <br />-0 Developed Water Resources(WR) <br />13. <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dry mining <br />15. On Site Processing: W1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator/Truck ` <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />IList any designated chemicals or acid - producing materials to be used or stored within permit area: <br />u <br />i1 <br />II <br />1 <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Installation of a French drain along the south and west portions of the north cell of Pit 29 (Parcel A) to <br />alleviate ground water mounding at the pinch point between Pit 29 and the Stagecoach Pit. The French <br />drain along the wast r0da will he locatAd Inside the pra!qant parma boundaM a-q will all construction <br />activities for the initial installation of that drain. The French drain along the south side will be located <br />An easement for the south drain and the construction activities has been obtained and one purpose of this <br />ai - -e d iiard is to obtain approve' for an extemsion of the permit ama (by approximately 2.2 aeres) to <br />accommodate these activities. <br />