Laserfiche WebLink
T. Bird, GCC Energy, LLC <br />C -1981 -035 / Sed. Pond Insp. Review <br />31 Dec 2014 <br />Page 2 of 2 <br />(15) Certified inspection reports required by 4.05.9(14) for all impoundments shall include <br />discussion of <br />(a) Any appearance of erosion, instability, structural weakness or other hazardous <br />conditions; <br />(b) Existing and required monitoring procedures and instrumentation; <br />(c) The depth and elevation of any impounded waters at the time of the certified report; <br />(d) Existing storage capacity of the impoundment; and <br />(e) Any other aspects of the structure affecting stability, or requiring maintenance. <br />The quarterly pond inspection report submitted for King I is in compliance with 4.09(17). While <br />quarterly inspection by a licensed P.E. is not required by our Rules, the Division appreciates the <br />extra effort being put forth by GCC Energy. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />Cc: Dan Hernandez, DRMS <br />