Laserfiche WebLink
Monitor well #I Prince Albert #I <br />Continued <br />March 30,2011; hole probed dry, 432.4 TD <br />July 11, 2011; hole probed dry 432.2 <br />November 16, 2011 hole probed dry 432 feet <br />April 19, 2012 hole probed dry 432feet <br />June 17, 2012 hole probed dry 432 feet <br />September 29, 2012 hole probed dry 431.6 feet <br />November 21, 2012 hole probed dry 431.6 TD <br />March 27, 2013, hole probed dry 43I.6 TD <br />June 8, 2013, hole probed dry 431.4 TD <br />September 3, 2013, hole probed dry 431.2 TD <br />November 25, 2013 hole probed dry 431.2 ' <br />\I-- <br />