Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.225 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.6619 <br /> Adjusted unit production: 472.80 LCY/hr <br /> Adjusted fleet production: 472.8 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.347/LCY <br /> Total job time: 1.90 Hours <br /> Total job cost: $312 <br />