My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-31_INSPECTION - M1991082
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1991082
>
2014-12-31_INSPECTION - M1991082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:16 PM
Creation date
1/5/2015 2:00:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991082
IBM Index Class Name
Inspection
Doc Date
12/31/2014
Doc Name
Insp. Rpt.
From
DRMS
To
Estate of Frank Laughrey
Inspection Date
12/23/2014
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Tiger Timber Site Permit Action: 2014 Update Permit/Job#: M1991082 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/30/2014 County: Teller Filename: M082-000 <br /> User: TC1 <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Spread Topsoil DOZER 1 1.90 $312.00 <br /> 002 Backfill Highwall LOADER 1 26.65 $3,614.00 <br /> 003 Spread Sawdust/Wood Chips GRADER 1 2.91 $291.00 <br /> 004 4-Fertilize&5 -Seed REVEGE 1 0.00 $2,621.00 <br /> 005 Mob/Demob MOBILIZE 1 5.50 $2,496.00 <br /> SUBTOTALS: 36.96 $9,334 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $188.55 <br /> Performance bond: 1.05% Total= $98.01 <br /> Job superintendent: 42.57 hrs Total= $3,199.56 <br /> Profit: 10.00% Total= $933.40 <br /> TOTAL O&P= $4,419.52 <br /> CONTRACT AMOUNT(direct+O&P)= $13,753.52 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.00% $687.68 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $5,107.20 <br /> TOTAL BOND AMOUNT(direct+indirect)_ $14,441.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.