Laserfiche WebLink
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: COLORADO SPRINGS <br /> Total one-way travel distance: 35.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $2,403.69 <br /> Total Roadable Mob/Demob Cost** $92.37 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): __ 0.88 0.88 <br /> Return Time(Hours): 0.88 0.88 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.75 1.75 <br /> JOB TIME AND COST <br /> Total job time: 5.50 Hours <br /> Total job cost: $2,496 <br /> CIRCES Cost Estimating Software <br />