Laserfiche WebLink
Van Cleave <br /> January 5,2015 <br /> Page 2 of 2 <br /> maximum length and height of high wall,where backfill material will be obtained,how placed, etc. <br /> will be required,and the required bond amount will increase accordingly. <br /> (e) Timeline;would you like to classify this operation as an"intermittent operation"at this time? If the <br /> operation is classified as "intermittent" during the initial application, then periods of inactivity of greater <br /> than 6 months would be allowed without having to apply to the Division for"Temporary Cessation"status. <br /> EXHIBIT L - Reclamation Costs (Rule 6.4.12): (1) all information necessary to calculate the costs of <br /> reclamation must be submitted and broken down into the various major phases of reclamation. You must <br /> provide sufficient information to calculate the cost of reclamation that would be incurred by the state. <br /> The preliminary reclamation bond summary based on the information provided has been included with this <br /> letter. The required reclamation bond due upon permit approval will be$42,200. As previously stated,this <br /> estimate assumes that the pit is mined to a final slope of no steeper than 3:1. <br /> Additional Information: DRMS will still need to schedule and conduct a pre-operational site inspection <br /> after the public comment period expires to verify the permit boundary markers and notice posting,etc. <br /> Any letters from other commenting agencies/entities received by the Division to date have been included <br /> with this correspondence for you to review. <br /> This concludes the Division's preliminary adequacy review of this application. This letter shall not be <br /> construed to mean that there are no other technical deficiencies in your application. Other issues may arise <br /> as additional information is supplied. Please remember that the decision date for this amendment <br /> application is February 22, 2015. As previously mentioned, if you are unable to provide satisfactory <br /> responses to any inadequacies prior to this date,it will be your responsibility to request an extension of time <br /> to allow for continued review of this application. If there are still unresolved issues when the decision date <br /> arrives and no extension has been requested, the application will be denied. If you have any questions, <br /> please contact me at(303)866-3567 x8140. <br /> Sincerely, <br /> Eric Scott—Environmental Protection Specialist <br /> CC: Mike Asmus via e-mail <br /> Enclosures: Comment letters from DWR,History Colorado <br />