Laserfiche WebLink
Jim <br /> STATE OF COLORADO <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> R <br /> 1313 Sherman St.,Room 215 4 <br /> COLORADO- <br /> Denver, <br /> O Denver,Colorado 80203 <br /> 0"0/W--- 063 NOV 19 2014 DIVISION o f <br /> M Phone:(303)866-3567 <br /> FAX:(303)832-8106 DIVISION OF RECLAMATION MININGAND SAFETY <br /> CONSTRUCTION MATERIALS <br /> REGULAR(112)OPERATION <br /> RECLAMATION PERMIT APPLICATION FORM <br /> CHECK ONE:n There is a File Number Already Assigned to this Operation <br /> Permit N M - - - (Please reference the file number currently assigned to this operation) <br /> nal New Application(Rule 1.4.5) r Amendment Application(Rule 1.10) <br /> Conversion Application(Rule 1.11) <br /> Permit/1 M - - - (provide for Amendments and Conversions of existing permits) <br /> The application for a Construction Materials Regular 112 Operation Reclamation Permit contains three major parts: (1)the application <br /> form;(2)Exhibits A-S,Addendum 1,any sections of Exhibit 6.5(Geoteclmical Stability Exhibit;and(3)the application fee. When you <br /> submit your application, be sure to include one (1) complete signed and notarized ORIGINAL and one (1) copy of the completed <br /> application form,two(2)copies of Exhibits A-S,Addendum 1,appropriate sections of 6.5(Geotechnical Stability Exhibit,and a check for <br /> the application fee described under Section(4)below. Exhibits should NOT be bound or in a 3-ring binder;maps should be folded to <br /> 8 1/2"X 11"or 8 1/2"X 14"size. To expedite processing,please provide the information in the format and order described in this form. <br /> GENERAL'OPERATION fl FORMATION <br /> Type or print clearly,in the space provided,ALL Information requested below. <br /> 1. Applicant/operator or company name(name to be used on permit): White River City Investments <br /> 1.1 Type of organization(corporation,partnership,etc.): Corporation <br /> 2. Operation name(pit,mine or site name): WRC Wet Pit <br /> 3. Permitted acreage(new or existing site): 50.80 <br /> permitted acres <br /> 3.1 Change in acreage(+) <br /> acres <br /> 3.2 Total acreage in Permit area <br /> acres <br /> 4. Fees: <br /> 4.1 New Application <br /> 4.2 New Quarry Application $2,696.00 application fee <br /> 4.4 Amendment Fee $3.342.00 quarry application <br /> 4.5 Conversion to 112 operation(set by statute) $2.229.00 amendment fee <br /> $2,696.00 conversion fee <br /> 5. Primary commodities)to be mined: Gravel <br /> 5.1 Incidental cornnroditie(s)to be mined: 1 Topsoil 125,000 . 2 / <br /> lbs/Tons/yr <br /> 3. / lbs/Tons/vr , 4. / lbs/Tons/vr 5. / lbs/Tons/vr <br /> 5.2 Anticipated end use of primary commodities)to be mined: Road Base <br /> m <br /> 5.3 Anticipated end use of incidental commoditie(s)to be mined: Topsoil <br />