Laserfiche WebLink
Page 3 of 4 <br /> If"NO"please explain: <br /> 14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br /> State Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br /> 15. Are all hazardous materials stored within approved spill containment structures? <br /> YES NO N/A <br /> 16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring information <br /> annually? <br /> YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br /> 17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br /> place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br /> FINANCIAL WARRANTY DOCUMENTATION ATTACHED. <br /> 18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br /> the preceding year, including the locations and number of new surface drill holes, mud pits, excavations,rock dumps, <br /> adits, shafts,trenches,pits,roads and structures. If applicable, you must also describe the measures taken to safeguard <br /> shafts,adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br /> should be attached if needed. <br /> 19. As required by rule 5.6.1(f), attach a map to this report that accurately depicts the NOI boundary, current affected <br /> area, location of all previously listed featured,and all acreages listed in items 6 through 12 and item 20. These <br /> activities must be identified on a site map of adequate scale to field locate these areas, and may include coordinates in <br /> latitude and longitude to at least 5 decimal places, or UTM coordinates with the datum and zone specified. <br /> UPDATED MAP ATTACHED: <br /> 20. Rule 5.7 requires submittal of final abandonment reports within 60 days for any drill hole(s)with artesian flows and <br /> no later than 12 months for all other completed drill holes. <br /> ABANDONMENT REPORTS ATTACHED: or..N/A <br />