My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-29_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2014-12-29_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:13 PM
Creation date
12/29/2014 12:30:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
12/29/2014
Doc Name
4th Quarter Horse Gulch Fill Inspection Report Review
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Fbom 215 <br />Denver. C080203 <br />December 29, 2014 <br />Tonia M. Perkins, P.E. <br />Trapper Mining, Inc <br />P.O. Box 187 <br />Craig, CO 81626 <br />RE: Trapper Mining, Inc., Permit C- 1981 -010 <br />4th Quarter 2014 - Horse Gulch Fill Quarterly Inspection Report <br />Dear Ms. Perkins: <br />The Colorado Division of Reclamation, Mining, and Safety ( CDRMS) has reviewed and found the above <br />referenced report to be in general compliance with the following CDRMS regulations: <br />4.09. ](11) (a) Inspected at least quarterly by a reregistered engineer or other qualified professional <br />specialist in construction of earth and rockfill embankments under the direction of a <br />qualified engineer throughout the construction. <br />The certified report covers the fourth quarter monitoring period from October to <br />December of 2014, and the inspections were conducted by yourself, a certified engineer <br />on December 16, 2014. One discrepancy was noted, the quarterly fill certification sheet <br />indicated the inspection was conducted on September 26, 2014, however the report <br />indicates the inspection was conducted on December 16, 2014. <br />4.09. ](1]) (b) Provide to the Division a certified report within 2 weeks after each inspection that the fill <br />has been constructed as specified in the design approved by the Division. The report <br />shall include a description of any appearances of instability, structural weakness, and <br />other hazardous conditions. <br />The inspection was conducted on December 16, 2014. The Division received the report <br />on December 22, 2014. No instability, structural weakness, or other hazardous <br />conditions were noted during this inspection of the fill. The area where cracks were <br />detected on the top south portion of the fill during the first quarter of 2013 was inspected <br />and no additional cracks were observed. Other areas were differential settling has been <br />observed in the past was inspected and no additional settling was observed. The spring <br />that was discovered during the third quarter of 2011 was not flowing at the time of the <br />inspection. <br />OF CO`O <br />1313 Sherman Street, Room 215, Denver, C080203 P303.866.3567 F303.832.8106 http: / /mining.state.co.us I <br />John W Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director *,� 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.