My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_PERMIT FILE - P2014022 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014022
>
2014-12-24_PERMIT FILE - P2014022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:11 PM
Creation date
12/29/2014 8:49:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014022
IBM Index Class Name
PERMIT FILE
Doc Date
12/24/2014
Doc Name
New NOI- Prospecting, Form 2
From
Total E&P USA Oil Shale, LLC
To
DRMS
Email Name
GRM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />See attached page 19. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />After completion of drilling operations, all the drill holes will be plugged and abandoned <br />according to Rule 5.4 of the Hard Rock/Metal Mining Rules and Regulations. All holes will <br />be plugged using inert i and then capped with a cement plug. in the event that wa er is <br />encountered during drilling the entire hole will be sealed with a high quality sodiurn <br />hentnnite type c and then car)13P A with a_ cement Tlua <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Once drilling is completed all open pits will be backfilled and closed and the drill pad <br />recontoured to blend into the existing topography. Drill cuttings will either be spread to a <br />depth of 112" or less or buried in the pit. Depressions that collect storm water and allow it to <br />aeeumulate and peel will be filled te allew wateF dFainege. Remeved seil will be spFead <br />evenly over the disturhed areas and will he reseeded with the seed mix under Section 7 of <br />this application. Vegetation removed during construction will either be mulched and used <br />to aid in revegetation or properly disposed of. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />Similar proc-e-d-Wre-s- -as those- used on droll Padr, Will be- used for ro2ds Once drollinn 1,2 <br />completed all newly constructed access roads will be blended into existing terrain. The <br />upgraded road to GRH -5 will be restored to existing conditions. Depressions will be graded <br />to drain. Removed soil will a spread evenly over the is ur a areas and will a reseeded <br />
The URL can be used to link to this page
Your browser does not support the video tag.