Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />UCropland(CR) F Pastureland(PL) General Agriculture(GA) <br />�✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) IndusMal /Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use check one): <br />ElCropland(CR) Pastureland(PL) General Agriculture(GA) <br />M17 Rangeland(RL) Forestry(FR) �j Wildlife Habitat(AT) <br />Residential(RS) Recreation(RC) LJ Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />surface excavation of topsoil, overburden and gravel using dozers, loaders, trucks <br />15. On Site Processing: J 7.l Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Crushing, screening, stockpiling and loading <br />mining by dozers, loaders, trucks <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />fuel, oil, and other chemicals associated with the processing plants <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />