My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_REVISION - M2004051 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004051
>
2014-12-24_REVISION - M2004051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:53 PM
Creation date
12/29/2014 8:17:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004051
IBM Index Class Name
REVISION
Doc Date
12/24/2014
Doc Name
TR Submittal- Slurry Wall
From
Aggregate Industries
To
DRMS
Type & Sequence
TR1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lumps of up to 6 inches in their largest dimension will be permitted. No frozen material, ice, or frost <br />bearing soil shall be mixed into the backfill or allowed to be placed in the trench. Just prior to placing, the <br />backfill material shall have a slump of 2 to 6 inches. To this end, the material shall be sluiced with slurry <br />during blending operations. Sluicing with water will not be permitted. Containment berms will be <br />constructed where necessary to prevent slurry from entering rivers or ditches or flowing across the project <br />boundary. <br />3.08 BACKFILL PLACEMENT <br />The backfill shall be placed continuously from the beginning of the trench, in the direction of the <br />excavation, to the end of the trench. The toe of the slope of the trench excavation shall precede the toe of <br />the backfill slope so that the toe of the backfill shall not interfere with excavation, or as required to permit <br />proper cleaning of the trench bottom and to permit inspection and measurement. Placing operations shall <br />proceed in such a fashion that the surface of the backfill below the slurry shall follow a reasonably smooth <br />grade and shall not have hollows which may trap pockets of slurry during subsequent backfilling. Free <br />dropping of backfill material through the slung will not be permitted. Initial backfill shall be placed by <br />lowering it to the bottom of the trench with clamshell or excavator bucket until the surface of the backfill <br />rises above the surface of the slurry trench at the end of the trench. Additional backfill may than be placed <br />in such a manner that the backfill enters the trench by sliding down the forward face of the previously <br />placed backfill. To accomplish this, sufficient backfill shall be piled on the edge of the existing backfill to <br />cause a slump and sliding action on the face of the in -place backfill. The backfill shall not be dropped or <br />deposited in any manner that will cause segregation. An acceptable substitute for the initial placing of <br />backfill by the use of a clamshell bucket, shall be to begin excavation at a point outside of the limits of <br />work, a lead -in trench, which will provide a sufficient distance for the backfill face to form, by pushing <br />backfill into the trench, before the toe of the backfill reaches the point where the cut -off is required. The <br />lead in trench shall be 1.5:1 or flatter. <br />3.09 TREATMENT FOR TOP OF CUT -OFF TRENCH <br />Upon completion of backfill placement, and before drying of the backfill can occur, the cut -off trench shall <br />be capped in accordance with the details shown on the drawings or as directed by the Engineer. <br />3.10 CLEAN -UP <br />After completion of the backfill and capping, all remaining excavated material and slurry shall be removed <br />and placed in a manner acceptable to the Owner and the surface shall be cleaned and leveled as directed by <br />the Engineer. Excess slurry shall be disposed of by spreading in thin layers on adjacent areas designated by <br />the Engineer. No slurry shall be left in ponds, and all ponds shall be pumped dry and backfilled as <br />designated by the Owner or Engineer. <br />3.11 QUALITY CONTROL <br />If Owner accepts Alternate Bid Item A, the Contractor shall conduct the quality control tests for the cut -off <br />wall construction. Any deficiencies revealed by the quality control testing will be corrected immediately <br />by the Contractor. Testing requirements are summarized in Table 1 and specified herein. Testing results <br />shall be available for review by the Engineer on site and delivered to the Engineer on a weekly basis. If <br />Owner does not accept bid Alternative A, Engineer shall establish quality control system above. <br />3.12 TRENCHING CONTINUITY AND KEY <br />The Contractor shall be responsible for demonstrating to the satisfaction of the Engineer that the trench is <br />continuous and keyed into the bedrock surface. Trench continuity shall be assured by the action of <br />movement of the trench excavation equipment such that the digging tools can be passed vertically from top <br />to bottom of the trench as well as moved horizontally along the axis of the trench without encountering <br />unexcavated material. Penetration of the bottom of the trench into the bedrock shall be demonstrated by <br />Wattenberg Resource Pond 3 Slurry Wall Section 02168 — Slurry Wall Construction <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.