Laserfiche WebLink
y� RECEIVED <br /> DEC 232014 Page2of4 <br /> p ', „ — ..-.,,,,iATION <br /> po- <br /> �wINERAL. MP Annual Report <br /> !, .tip _�_. <br /> -------------- <br /> Permitt Name: Golden Eagle Uranium LLC Permit Number: l'-2010-008 <br /> Operation Name: DOE Lease WM-17 County: _ Montrose <br /> Annual Fee Due: $86.00 Anniversary Date: December 29,2014 _ <br /> Permit Acreage: 1.00 Current Bond Amt: $100.00 <br /> According to Colorado Statute, each year,on the anniversary date of the permit,an operator shall submit the Annual Fee, <br /> an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring information, <br /> reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br /> the upcoming year, any reclamation that will be performed during the upcoming year,the dates for the beginning of active <br /> operations,and the date active operations ceased for the year. <br /> Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br /> compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br /> rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the affected area boundary clearly marked if you have an excavation or portal? YES lin <br /> 2. Is the site in final reclamation? YES a <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. ``,� <br /> 3. What was the date of last exploration activity? /v/A- <br /> 4. What date did prospecting activity end,or what date is it expected to end?Rule 5.6.1(e). /VlA <br /> 5. Number of acres currently affected(exploration+incomplete reclamation). 0 <br /> 6. Number of acres that were newly affected during the current report year. in <br /> 7. Number of acres that were reclaimed during the current report year. <br /> 8. Estimated new acreage to be affected in the next report year. <br /> 9. Estimated acres to be reclaimed in the next report year. d <br /> 10. Total acres in various stages of reclamation,since permitted exploration activities began: <br /> Total acres I Total acres Total acres Total acres <br /> backfilled: 17 seeded w/ 0 w/topsoil p mulched w/ 0 <br /> approved mix: replaced: approved mulch: <br /> Total acres j Total acres Topsoil Mulch application <br /> graded: 0 fertilized w/ 0 replacement O rate(tons/ac): 0 <br /> apvd fertilizer: depth (in.): <br /> Seed ! Fertilizer Mulch <br /> application N/4- application ill i4 application N7A <br /> method: method: method: <br /> 11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO CI <br /> If"YES", indicate the weed species,control area, control type, application rate and treatment date on the report map. <br /> 12. Is adequate topsoil reserved for reclamation, based on your approved NOI? YES NO <br /> If"NO",please explain: <br />