My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-19_ENFORCEMENT - C2010089
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C2010089
>
2014-12-19_ENFORCEMENT - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:05 PM
Creation date
12/23/2014 1:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Enforcement
Doc Date
12/19/2014
Doc Name
Extension of Time for Abatement Notice
From
DRMS
To
Western Fuels , Colorado, LLC
Violation No.
CV2014004
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVCOLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining. state. co. us <br />EXTENSION OF1 TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />Cessation <br />CV- 2014 -004 <br />Notice of <br />CV- 2014 -004 <br />Order No. <br />Violation No. <br />Date NOV or <br />June 26, 2014 <br />Permit No.: <br />C -2010 -089 <br />CO Issued: <br />Mine: <br />New Horizon North Mine <br />County: <br />Montrose <br />Operator (If <br />Western Fuels - Colorado, LLC <br />Type of Mine: <br />Surface <br />Other than <br />Permittee): <br />Mail Address: <br />12050 N. Pecos St., Suite 100 <br />Permittee: <br />Western Fuels- Colorado, <br />Westminster, CO 80234 <br />LLC <br />Mail Address: <br />12050 N. Pecos St., Suite 100 <br />Westminster, CO 80234 <br />In Violation CV- 2014 -004, the deadline for abatement of the practice, condition or violation described <br />was fixed as described below. It is hereby found that the operator has failed to abate such practice, <br />condition or violation, or cannot complete abatement within the time allowed, but that such failure is <br />not due to lack of diligence on the part of the operator. The time for abatement is therefore extended <br />as follows: <br />Abatement Description Original Date Extended <br />Step Due Due Date <br />1 Reconstruct the sections of N14N -001 East and West September 15, January 16, <br />Ditches that are currently not in compliance with their 2014 2015 <br />original approved designs; or obtain approval of a <br />Technical Revision revising the original approved <br />designs, in compliance with the requirements of Rule <br />2.05.3(4)(d), so as to conform to the on- the - ground <br />construction. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: December 19, 2014 <br />By: I <br />(Signature of Authorized Representative) [Signa"Kire of Division Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Division's justification for <br />approving the extension beyond 90 days is attached. <br />Brock F. Bowles <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.