December 17, 2014 <br />Photograph 2: Spring above the 7470 Bench Elevation (1211612014) <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />Topsoil and organic material removal activities were not conducted during the quarter. <br />2.2 Placement of Underdrainage Systems <br />The underdrainage system was completed in the first quarter of 2010; additional work on this system is <br />not anticipated. During the time of the inspection, there was no water flow. <br />2.3 Installation of Surface Drainage Systems <br />Both the north and south surface drains were inspected (Photographs 3 and 4). At the time of the <br />inspection there was no water flow. The upper drain was inspected and was in excellent condition. <br />