My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-19_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2014-12-19_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:05 PM
Creation date
12/22/2014 1:41:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/19/2014
Doc Name
Midterm Review & Findings and Cost Estimate (MT-1)
From
DRMS
To
Western Fuels Colorado
Type & Sequence
MT1
Permit Index Doc Type
Findings
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deemed incomplete on October 8, 2010. WFC resubmitted the application on October 22, 2010 <br />and the DRMS deemed it complete on October 26, 2010. The Division issued its proposed decision <br />on May 4, 2012. The Division issued the permit on June 20, 2012. <br />The permit area of the New Horizon North Mine is 322 acres. <br />This Midterm Review is due on December 19, 2014. <br />SECTION II — REVISIONS TO THE PERMIT <br />The following is a summary of the revisions to the permit since the initial issuance Findings <br />Document dated May 4, 2012. <br />Revision No. Approval Date Nature of Revision <br />:• 4 <br />MR -1 <br />11/2/2012 <br />Emission Permit and Topsoil Salvage <br />No Change <br />MR -2 <br />1/30/2013 <br />Pond 001 As -Built Certification <br />No Change <br />MR -3 <br />3/7/2013 <br />Overburden Blasting <br />No Change <br />MR -4 <br />4/10/2013 <br />Substitute Water Supply Plan <br />No Change <br />MR -5 <br />6/18/2013 <br />Water Well Completion <br />No Change <br />MR -6 <br />5/17/2013 <br />APCD COOC for Phase 2 Work <br />No Change <br />MR -7 <br />7/19/2013 <br />Dewatering and Pit Well Permits <br />$4,935.57 <br />MR -8 <br />8/26/2013 <br />CDPHE APCD Construction Permit. <br />No Change <br />MR -9 <br />9/4/2013 <br />Stockpile Side Slopes <br />No Change <br />MR -10 <br />10/29/2013 <br />Monitoring Well Installation and Haul <br />No Change <br />Road Construction and Compaction <br />MR -11 <br />1/24/2014 <br />Revision to Permit Text Section 2.05.4(2) <br />No Change <br />and Air Permit Modification <br />TR -1 <br />5/3/2013 <br />Pond NHN -001 As -Built Certification <br />No Change <br />TR -2 <br />7/17/2013 <br />Section 2.05.3(6)(a) Overburden Blasting <br />No Change <br />TR -3 <br />8/30/2013 <br />Incidental Permit Boundary Revision <br />No Change <br />TR -4 <br />10/1/2013 <br />As -Built Information for NHN -001 <br />No Change <br />Collection Ditches <br />TR -5 <br />5/12/2014 <br />Monitoring Well Installation and Haul <br />- $90,237.00 <br />Road Construction and Compaction <br />TR -6 <br />11/4/2014 <br />Changes to pond and ditch designs, the <br />$4,898.58 <br />surface water monitoring plan, pit limits <br />and ARR due date <br />TR -7 <br />11/13/2014 <br />NHN -001 East and West Ditch As -Built <br />No Change <br />SECTION III — STATUS OF STIPULATIONS <br />Stipulation 1 — States if new information becomes available for threatened and endangered <br />species, if a new species becomes listed, if incidental take occurs, if the total average annual <br />amount of water depleted by the New Horizon North Mine changes, or if any other project <br />element changes which alters the operation of the project from what is approved in the initial <br />New Horizon North Mine -3- 12/20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.