Laserfiche WebLink
4. A discussion needs to be added to section 2.05.6(3) of the permit on how the disturbances <br />planned within the stream buffer zones will comply with the performance standards outlined in <br />Rule 4.05.18(1)(a)(b) and (c). <br />A Corps of Engineers 404 permit needs to be obtained prior to disturbing stream crossings and <br />wetlands within the permit area which are located within the stream buffer zones. ATC is <br />proposing to disturbed areas within stream buffer zones and it is unclear if a 404 permit has been <br />obtained. Please submit a copy of the 404 permit for inclusion into the permit and update <br />Sections 2.05.6(3) and 2.03. 10 accordingly. <br />New Horizon North Mine -8- 12/20/2014 <br />