Laserfiche WebLink
December 15, 2014 C- 1982- 056/Foidel Creek Mine JDM <br />reclaimed valley and to the west of the Area 1 Pit. The CRDA and expansion continues to be an active refuse pile <br />in construction. <br />Refuse material continues to be placed in the RDA expansion area. Material was being stockpiled at the north end <br />of the RDA at the time of the inspection. The RDA was snow - covered and well compacted at the time of the <br />inspection. The refuse material had not yet reached the head of the under -drain of the RDA. <br />During the October complete inspection the northern portion of the RDA Expansion, where the new material <br />meets the existing RDA material, showed evidence of a small amount of cover material on the existing RDA. This <br />material is required to be stripped and salvaged to avoid placement of the new material on unsuitable material. <br />This appeared to be completed at the time of the inspection. <br />,tea <br />RDA Stockpile <br />RDA Expansion Area <br />A large gully was observed during the October inspection on the west slope of the RDA along the upper haul road <br />in Areas 2, 3 and 4. No instability was observed and RDA material was contained in the roadside ditches and <br />cleared. The erosional gully has been addressed and repaired with no additional signs of instability. The upper <br />portion of the RDA areas will require re- grading as weather and ground conditions allow ensuring that run -off <br />does not collect in the low portion and create further down - cuttina which can lead to instabilitv of the vile. <br />1 <br />RDA Erosion Repair <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 6 <br />�7 <br />