Laserfiche WebLink
COlo DEPARTMENT OF NATURAL RESOURCES <br /> DIVISION OF WATER RESOURCES <br /> * I; <br /> John W.Hickenlooper <br /> \\I$7 6 Governor <br /> -_- Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response Reclamation Permit Application Consideration <br /> DATE: December 16, 2014 <br /> /TO: Michael A. Cunningham, Environmental Protection Specialist <br /> CC: Division 2 Office; District 10 Water Commissioner <br /> FROM: Caleb Foy, E.I.T. CVP RECEIVED <br /> RE: The Rise Above, File No. M-2014-054 UtC $ ZO <br /> Operator: Amanda Adkins&Travis Anderson 14 <br /> Contact: Amanda Adkins Anderson,(719) 568-0373 01VISIONOFRECLAMATIO N <br /> Sec. 12, Twp. 14S, Rng. 68W, 6`h P.M., El Paso County MININGANp,sAFETy <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> COMMENTS: According to the application, no water will be used in conjunction with the operation. <br /> Office of the State Engineer <br /> 1313 Sherman Street, Suite 818•Denver, CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> http://water.state.co.us <br />