Laserfiche WebLink
month long window between June 15th and July 15th depending on local rainfall patterns during that <br /> particular year. <br /> Final slopes will be no greater than 3:1, FIN,with the visual berm along the south side of the permit <br /> area left after mining for privacy and night-time headlight mitigation from Road 305. The berms will <br /> be constructed with overburden materials, primarily sandy and gravelly soils encountered during <br /> gravel extraction operations. <br /> 7 <br />