My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-17_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2014-12-17_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:27 PM
Creation date
12/19/2014 7:52:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
Revision
Doc Date
12/17/2014
Doc Name
Incompleteness Letter
From
DRMS
To
Brannan Sand and Gravel Company, L.L.C.
Type & Sequence
AM2
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brannan Sand and Gravel Company, L.L.C. <br /> December 17, 2014 <br /> Page 4 of 6 <br /> 1. Final grading - specify maximum anticipated slope gradient or expected ranges <br /> thereof, <br /> 2. Seeding - specify types, mixtures, quantities, and expected time(s) of seeding and <br /> planting; <br /> 3. Fertilization - if applicable, specify types, mixtures, quantities and time of <br /> application; <br /> 4. Revegetation-specify types of trees,shrubs,etc.,quantities,size and location; and <br /> 5. Topsoiling-specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> e. EXHIBIT F-Reclamation Plan Man(Rule 6.4.6): <br /> The map(s) of the proposed affected land,by all phases of the total scope of the mining operation, <br /> shall indicate the following: <br /> i. The expected physical appearance of the area of the affected land, correlated to the <br /> proposed mining and reclamation timetables. The map must show proposed topography of <br /> the area with contour lines of sufficient detail to portray the direction and rate of slope of all <br /> reclaimed lands;and <br /> ii. Portrayal of the proposed final land use for each portion of the affected lands. <br /> f. EXHIBIT L-Reclamation Costs(Rule 6.4.12): <br /> All information necessary to calculate the costs of reclamation must be submitted and broken down <br /> into the various major phases of reclamation. You must provide sufficient information to calculate <br /> the cost of reclamation that would be incurred by the state. <br /> g. EXHIBIT M-Other Permits and Licenses(Rule 6.4.13): <br /> A statement identifying which of the following permits, licenses and approvals the <br /> Operator/Applicant holds or will be seeking in order to conduct the proposed mining and <br /> reclamation operations: effluent discharge permits,air quality emissions permits,radioactive source <br /> material licenses, the State Historic Preservation Office clearance, disposal of dredge and fill <br /> material(404)permits,permit to construct a dam,well permits,highway access permits,U.S.Forest <br /> Service permits,Bureau of Land Management permits,county zoning and land use permits,and city <br /> zoning and land use permits. <br /> h. EXHIBIT N-Source of Legal Right to Enter(Rule 6.4.14): <br /> Provide a description of the basis for legal right of entry to the site and to conduct mining and <br /> reclamation, for Owners of Record described in Rule 1.6.2(1)(e)(i). This may be a copy of access <br /> lease, deed, abstract of title, or a current tax receipt. A signed statement by the Landowner and <br /> acknowledged by a Notary Public stating that the Operator/Applicant has legal right to enter and <br /> mine is also acceptable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.