My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-18_REVISION - M2001069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001069
>
2014-12-18_REVISION - M2001069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:22 PM
Creation date
12/19/2014 7:52:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001069
IBM Index Class Name
Revision
Doc Date
12/18/2014
Doc Name
Response
From
DWR
To
DRMS
Type & Sequence
AR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br /> All <br /> 9 <br /> DIVISION OF WATER RESOURCES <br /> John W.Hickenlooper <br /> 18 76 Governor <br /> Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Partial Acreage Release Request Consideration <br /> DATE: December 16, 2014 <br /> /TO: Bob Oswald, Environmental Protection Specialist DECEIVED <br /> CC: Division 3 Office; District 20 Water Commissioner <br /> FROM: Caleb Foy, E.I.T. C�� DEC 18 2014 <br /> ,- DIVISION OF RECLAMATION <br /> RE: Del Norte West Valley Pit, File No, M-2001-069 MINING AND SAFETY <br /> Operator: Asphalt Constructors, Inc. <br /> Contact: Tiffany Hawkins <br /> Sec. 21, Twp. 40N, Rng. 6E, N.M.P.M., Rio Grande County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> COMMENTS: N/A <br /> Office of the State Engineer <br /> 1313 Sherman Street,Suite 818•Denver,CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> http://water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.