Laserfiche WebLink
f <br /> COl \ DEPARTMENT OF NATURAL RESOURCES / <br /> DIVISION OF WATER RESOURCES <br /> * * . <br /> * N -ua John W.Hickenlooper <br /> Governor <br /> Mike King <br /> Executive Director <br /> Dick Wolfe,P.E. <br /> Director/State Engineer <br /> Response to Reclamation Permit Partial Acreage Release Request Consideration <br /> DATE: December 16, 2014 <br /> A: Wallace H. Erickson, Environmental Protection Specialist <br /> CC: Division 3 Office; District 24 Water Commissioner <br /> FROM: Caleb Foy, E.I.T. Cf RECEIVED <br /> RE: San Luis Project, File No. M-1988-112 DEC 8 2��4 <br /> Operator: Battle Mountain Resources, Inc. <br /> Contact: Julio Madrid, (719) 379-0538 DIVISION OFRECLAMAT" <br /> Sec. 22, Twp. 32S, Rng. 71 W, 6`h P.M., Costilla County MINING AND SAFETY <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore,exposure of ground <br /> water must not occur during or after mining operations. If stormwater is contained on-site, it must <br /> infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br /> must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br /> obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br /> unless an augmentation plan approved by water court is obtained. <br /> ® The proposed operation will consume ground water by: ❑ evaporation, ❑ dust control, <br /> ® reclamation, ❑ water removed in the mined product, ❑ processing, ® other: animal shelter. <br /> ® Other: The conditions of approval of valid well permit no. 251799, attached, shall remain in force <br /> and effect. <br /> COMMENTS: N/A <br /> Office of the State Engineer <br /> 1313 Sherman Street,Suite 818•Denver,CO 80203•Phone:303-866-3581 •Fax:303-866-3589 <br /> http://water.state.co.us <br />