My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5of 151 <br />BLASTING MATERIALS QUANTITIES <br />QUANTITYUNIT <br />Total Quantity of Stemming Required:49.97cubic yards <br />Total Quantity of Explosives Required:27,789pounds <br />Total Quantity of det. cord/fuse/wire Required:11,155linear feet <br />Quantity of Blasting Caps per Blasthole:1cap(s) <br />Total Quantity of Blasting Caps Required:254caps <br />Quantity of Primers per Blasthole:1primer(s) <br />Total Quantity of Primers Required:254primers <br />Quantity of Delays per Blasthole:1delay(s) <br />Total Quantity of Delays Required:256delays <br />HOURLY EQUIPMENT COST <br />Shiftbasis: 1 per day <br />Description <br />Drilling Equipment -Drill:Atlas Capco DM45/LP -7-7/8” <br />-Drill Pad Preparation:NA <br />Misc. Drill Support Equipment:NA <br />Misc. Explosives Support Equipment:NA <br />Explosives Delivery–BulkTruck:ANFO Bulk Delivery Truck <br />-CapTruck:Cap Delivery Truck <br />DrillingDrill PadMisc.DrillMisc.Expl.Explosives Delivery <br />Cost Breakdown: <br />EquipmentPreparationSupportSupportBulk TruckCap Truck <br />DrillingMiscTruckMiscTruck <br />%Utilization-machine:100NANANA1010 <br />Ownership cost/hour: $68.54NANANA$67.53$5.42 <br />Operating cost/hour:$171.37NANANA$9.01$1.90 <br />Ripper op. cost/hour:NANANANA$0.00$0.00 <br />Operator cost/hour:$61.79NANANA$37.36$37.36 <br />Unit Subtotals:$301.70$0.00$0.00$0.00$113.90$44.69 <br />Number of Units:100011 <br />Group Subtotals:$301.70$0.00$0.00$0.00$113.90$44.69 <br />$460.29 <br />Total work team cost/hour: <br />MATERIALS COST <br />DescriptionUnitUnit CostQuantityTotal Cost <br />Bulk ANFO nom. density <br />Blasting Agent:( 7,900-15,000 fps )Pound$0.23427788.934$6,502.61 <br />Cast primer, 0.3 lb <br />(electric or non-electric <br />Primers or Boosters:Each$2.885254.000$732.79 <br />system) <br />Non-electric cap, inst. <br />Blasting Caps:(non-electric systems)Each$3.856254.000$979.42 <br />Det. Cord, fuse, or Detonating cord, 10 gr./ft. <br />wire:(non-electric systems)Linear foot$0.11911155.320$1,327.48 <br />MS connectors (non- <br />Delays:electric systems)Each$4.914256.000$1,257.98 <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing- <br />Miscellaneous:imported)Cu. yd.$27.19049.972$1,358.74 <br />Drill bits:Bit life = 1,750Linear feet$2,152.003.164$6,809.17 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.