Laserfiche WebLink
Page 38of 151 <br />MOTOR GRADER WORK <br />Task description:Finish Grade Facilities Area <br />Permit Action:2014 Midterm <br />Site:New Horizon North MineReview (MT-1)Permit/Job#:C2010089 <br />PROJECT IDENTIFICATION <br />Task #:031State:ColoradoAbbreviation:None <br />Date:12/12/2014County:MontroseFilename:C089-031 <br />User:SLB <br />Agency or organizationname:DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine:CAT 14MHorsepower:259 <br />Ripper Attachment:Shift Basis:1 per day <br />Data Source:(CRG) <br />Cost Breakdown: <br />Utilization <br />% <br />Ownership Cost/Hour:$42.03NA <br />Operating Cost/Hour:$69.88100 <br />Ripper Operating Cost/Hour:$0.00 <br />Operator Cost/Hour:$24.47NA <br />Total Unit Cost/Hour:$136.37 <br />Total Fleet Cost/Hour:$136.37 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped:8.30acres <br />Source of estimated acreage:Map 2.05.2-1 <br />HOURLY PRODUCTION <br />Average Grader Speed:1.50mph <br />Selected Application:Finish grading (0-2.5 mph) -1.5 <br />Selected Blade Angle:30degrees <br />Effective Blade Length:12.10feet <br />Width of blade overlap per pass:2.00feet <br />Net grading or ripping width per pass:10.10feet <br />Unadjusted Hourly Unit Production:1.8364acres/hour <br />Job Condition Correction FactorsSite Altitude: 5000 feet <br />Source <br />Altitude Adj:1.00(CAT HB) <br />Job Efficiency:0.90(1sh/d, fav.) <br />CIRCES Cost Estimating Software <br />