Laserfiche WebLink
Page 13of 151 <br />Dozing method:1.000(GEN.) <br />Visibility:1.000(AVG.) <br />Job efficiency:0.830(1 SHIFT/DAY) <br />Spoil pile:0.800(FND-RF) <br />Push gradient:1.000(CAT HB) <br />Altitude:1.000(CAT HB) <br />Material Weight:0.868(CAT HB) <br />Blade type:1.000(PAT) <br />Net correction:0.3890 <br />Adjusted unit production:1,116.55 LCY/hr <br />2233.1 <br />Adjusted fleet production:LCY/hr <br />JOB TIME AND COST <br />Fleet size:2 Dozer(s) <br />Unit cost:$0.466/LCY <br />9.75 <br />Total job time:Hours <br />Total job cost:$10,149 <br />CIRCES Cost Estimating Software <br />