My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1of 151 <br />COST SUMMARY WORK <br />Task description:Cost Summary 2014 Midterm Review <br />Permit Action:2014 Midterm <br />Site:New Horizon North MineReview (MT-1)Permit/Job#:C2010089 <br />PROJECT IDENTIFICATION <br />Task #:000State:ColoradoAbbreviation:None <br />Date:12/12/2014County:MontroseFilename:C089-000 <br />User:SLB <br />: <br />Agency or organization nameDRMS <br />TASK LIST (DIRECT COSTS) <br />FormFleet <br />Task <br />Task <br />HoursCost <br />DescriptionUsedSize <br />001Drill and Shoot HighwallBLASTING1147.81$56,834.00 <br />002Backfill Final Pit with Overburden StockpileTRUCK11795.18$1,700,740.00 <br />003Regrade Trailing Spoil RidgesDOZER21,264.64$1,315,945.00 <br />004Regrade Facilities AreaDOZER29.75$10,149.00 <br />005Regrade Overburden Stockpile AreaDOZER25.74$5,976.00 <br />010Rip Facilities AreaRIPPER25.76$6,385.00 <br />011Rip West Haul RoadRIPPER23.78$4,193.00 <br />012Rip East Haul RoadRIPPER25.73$6,354.00 <br />013Rip Northwest Haul RoadRIPPER21.75$1,946.00 <br />014Rip Equipment Corridor RoadRIPPER24.02$4,462.00 <br />015Rip All Topsoil Replacement Areas Prior to RIPPER2136.96$151,656.00 <br />Reseeding <br />020Regrade West Haul RoadDOZER216.31$16,976.00 <br />021Regrade East Haul RoadDOZER224.75$25,753.00 <br />022Regrade Northwest Haul RoadDOZER27.55$7,861.00 <br />023RegradeEquipment Corridor RoadDOZER230.36$31,589.00 <br />030Finish Grade Pit AreasGRADER144.71$6,098.00 <br />031Finish Grade Facilities AreaGRADER15.02$685.00 <br />032Finish Grade Overburden Stockpile AreaGRADER18.59$1,172.00 <br />040Regrade Pond NHN-001DOZER129.79$7,880.00 <br />041Regrade Pond NHN-002DOZER140.05$10,594.00 <br />042Regrade Pond NHN-003DOZER125.59$6,769.00 <br />043Regrade Ditch NHN-001 EastDOZER13.75$993.00 <br />044Regrade Ditch NHN-001 WestDOZER10.65$172.00 <br />045RegradeDitch NHN-002 NorthDOZER13.42$904.00 <br />046Regrade Ditch NHN-002 SouthDOZER11.16$306.00 <br />047Regrade Ditch NHN-003 NorthDOZER11.78$471.00 <br />048Regrade Ditch NHN-003 SouthDOZER12.91$768.00 <br />049Reconstruct 2nd Park Lateral DitchNA1105.88$145,440.00 <br />055Replace Topsoil from Stockpile to 2013 Pit AreaTRUCK1114.97$27,108.00 <br />056Replace Topsoil from Stockpile to 2014 Pit AreaTRUCK1117.34$37,091.00 <br />057Replace Topsoil from Stockpile to 2015 Pit AreaTRUCK1117.34$37,091.00 <br />058Replace Topsoil from Stockpile to 2016 Pit AreaTRUCK1124.86$53,177.00 <br />059Replace Topsoil from Stockpile to Facilities AreaTRUCK114.75$8,604.00 <br />060Replace Topsoil from Stockpile to Topsoil DOZER22.05$2,131.00 <br />Stockpile Area <br />061Replace Topsoil from Stockpile Overburden TRUCK118.78$15,908.00 <br />Stockpile Are <br />062Replace Topsoil from Stockpile to West Haul RoadTRUCK113.12$6,667.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.