Laserfiche WebLink
Page 80 of 151 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />751.82 <br />( %) <br />( %) <br />(fpm) <br />Time <br />2 Truck(s) <br />Adjusted hourly truck team production: 1,248.02 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,248.02 <br />(min) <br />1 <br />1400.00 <br />0.00 <br />3.00 <br />3.00 <br />2409 <br />1.017 <br />Haul Time: 1.017 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />751.82 <br />( %) <br />( %) <br />(fpm) <br />Time <br />2 Truck(s) <br />Adjusted hourly truck team production: 1,248.02 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,248.02 <br />min <br />1 <br />1400.00 <br />0.00 <br />3.00 <br />3.00 <br />3503 <br />0.671 <br />Return Time: <br />Total Truck Cycle Time: <br />0.671 <br />5.363 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 1,629.09 <br />LCY/Hour Adjusted for job efficiency: <br />1,352.15 LCY/Hour <br />Truck Unit Production <br />751.82 <br />LCY/Hour Adjusted for job efficiency: <br />624.01 LCY/Hour <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 1,248.02 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,248.02 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,248.02 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 8.78 <br />Hours <br />Unit cost: $1.451 /LCY <br />Total job cost: $15,908 <br />CIRCES Cost Estimating Software <br />