Laserfiche WebLink
Page 66 of 151 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />587.24 <br />( %) <br />( %) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,462.23 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,352.15 <br />(min) <br />1 <br />3000.00 <br />2.00 <br />3.00 <br />5.00 <br />1550 <br />2.142 <br />Haul Time: 2.142 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />587.24 <br />( %) <br />( %) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,462.23 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,352.15 <br />min <br />1 <br />3000.00 <br />-2.00 <br />3.00 <br />1.00 <br />3503 <br />1.049 <br />Return Time: <br />Total Truck Cycle Time: <br />1.049 <br />6.866 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 1,629.09 <br />LCY/Hour Adjusted for job efficiency: <br />1,352.15 LCY/Hour <br />Truck Unit Production <br />587.24 <br />LCY/Hour Adjusted for job efficiency: <br />487.41 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,462.23 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,352.15 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,352.15 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 17.34 <br />Hours <br />Unit cost: $1.582 /LCY <br />Total job cost: $37,091 <br />CIRCES Cost Estimating Software <br />