Laserfiche WebLink
Page 60 of 151 <br />Addendum to New Horizon North Mine Reclamation Cost <br />Task 049 SLB Estimate <br />C- 2010 -089 12/12/2014 Reconstruct 2nd Park Lateral Irrigation Ditch <br />The New Horizon North Mine will mine through the 2nd Park Lateral Ditch, which is owned and operated <br />by the Colorado Cooperative Company. This ditch will be relocated prior to mining and returned <br />to its original location following the completion of mining on the Garvey property (in the winter of 2016- <br />2017). According to Permit Section 2.05.3(4), the ditch will be reconstructed using buried HDPE pipe. <br />The Division has estimated that 3,600 linear feet of 8" HDPE pipe will be required to reconstruct the <br />2nd Park Lateral Irrigation Ditch. The cost for installation of the HDPE pipe is $40.40 (RS Means Site <br />Work and Landscape Cost Datea, 2014, Section 35 51 13.10 1610). The listed crew can complete 272 <br />linear feet of pipe per day. <br />Pipe <br />cost <br />Total <br />Hours <br />LF $ /LF <br />3,600.00 $40.40 $145,440.00 $145,440.00 <br />(3600 LF) / (272 LF /day) X (8 hrs /day) = 105.88 hrs <br />$145,440.00 <br />CIRCES Cost Estimating Software <br />