My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Review Comments
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
MT1
Email Name
SLB
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 38 of 151 <br />MOTOR GRADER WORK <br />Task description: Finish Grade Facilities Area <br />Permit Action: 2014 Midterm <br />Site: New Horizon North Mine Review (MT -1) Permit /Job#: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 031 State: Colorado Abbreviation: None <br />Date: 12/12/2014 County: Montrose Filename: C089 -031 <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour <br />Operating Cost/Hour: <br />Ripper Operating Cost /Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Cost Breakdown: <br />Utilization <br />$69.88 1 100 <br />$24.47 <br />$136.37 <br />Total Fleet Cost/Hour: $136.37 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />acres <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />052 -1 <br />1.50 mph <br />Finish grading (0 -2.5 mph) - 1.5 <br />30 <br />degree <br />12.10 <br />feet <br />2.00 <br />feet <br />10.10 <br />feet <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors Site Altitude: 5000 feet <br />Source <br />Altitude Adi : 1.00 CAT HB <br />Job Efficiency: 0.90 (lsh /d, fay.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.