Laserfiche WebLink
4 (FORM 2 -Public filing) <br /> 11. Describe proposed surface excavation or other land disturbance,including roads,pits,trenches,waste piles,drill pads and <br /> collar areas of underground workings,ponds,etc... <br /> 12. Proposed Disturbance(approximate)Describe the proposed drilling to be conducted,including anticipated number of holes, <br /> diameter,depth,location,etc... Submit additional pages if necessary: <br /> A. Drill Pads: Quantity Average Width (ft)Average Length (ft) <br /> B. Drill Holes:Quantity Depth (ft) Diameter (in) <br /> C. Mud Pits: Quantity Average Width (ft)Average Length (ft) <br /> Average Depth (ft) <br /> Described proposed underground work,including reopening of old workings,advancement of adits or shafts, <br /> trenches,pits,cuts,rock dumps,or other types of disturbance,describe type,quantity and general dimensions: <br /> The tonnage limit has increased to 24,000 tons as approved in the 09/19/2014 USFS <br /> Plan of pera ions (attached). I he secondary adit which was previously approve <br /> under this NO' has also been approved by the USFS and is attached as the LJSIFS <br /> POO- <br /> F. Other Disturbances(please describe): <br /> G. Indicate Chemicals and Fuels used or stored on site. List type,quantity and method to store. <br /> F. New Road(s): Length (ft)Width (ft) <br /> Significantly Upgraded Road(s) Length (ft)Width (ft) <br /> Are culverts or other crossings proposed? If so,please describe: <br />