RECLAMATION PLAN EXHIBIT E (cont) <br /> setbacks on the pit perimeter. The topsoil will be handled as <br /> little as possible until it is replaced onto disturbed areas . <br /> Albert Frei & Sons will take measures necessary to insure the <br /> stability of the replaced topsoil on graded slopes and ensuring <br /> that it is spread as evenly a possible. Fertilizer and other <br /> soil amendments will be used, if needed, in accordance with the <br /> NRCS recommendations . <br /> RECLAMATION TIMETABLE <br /> Reclamation will begin once enough area has been opened so that <br /> any reclamation completed will not be disturbed as mining <br /> progresses . This may take one or more years depending on the <br /> economic conditions in the area and the amount of material mined. <br /> By the time mining is completed approximately 30% of the total <br /> mined land will be reclaimed. As mining ends only final <br /> backfilling, grading and shaping of the site will be needed. We <br /> expect it to take 7 to 10 years after mining ends for backfilling <br /> to be completed. Final seeding will be done by the end of the <br /> second fall after filling is completed. The area will be <br /> monitored for success of revegetation until accepted by the <br /> Division for release . If revegetation failures occur prior to <br /> release, an analysis of the site will be made and the area will <br /> be revegetated again as necessary. <br /> RECLAMATION TIMETABLE <br /> ACRES ± <br /> AREA YEARS <br /> TOTAL WATER ROAD BACKFILL REVEGET UNDIS <br /> AREA ATION RBE <br /> Phase 1 3-5 19.44 5.50 0.11 7.71 10.43 3 .40 <br /> Phase 2 7-10 33 .73 0.00 0.62 30.42 33 .11 0.62 <br /> Totals 1 53 .17 1 5.50 1 0.73 1 38.13 1 43 .54 1 4 .02 <br /> 22(Revised 12/15/2014) <br />